Arm Staff Applications Engineer interview questions
based on 4 ratings - Updated Sep 22, 2024
Difficultinterview difficulty
Very positiveinterview experience
How others got an interview
33%
Recruiter
Recruiter
33%
Applied online
Applied online
33%
Staffing Agency
Staffing Agency
Interview search
4 interviews
Arm interviews FAQs
Staff Applications Engineer applicants have rated the interview process at Arm with 3.5 out of 5 (where 5 is the highest level of difficulty) and assessed their interview experience as 50% positive. To compare, the company-average is 65.8% positive. This is according to Glassdoor user ratings.
Candidates applying for Staff Applications Engineer roles take an average of 18 days to get hired, when considering 2 user submitted interviews for this role. To compare, the hiring process at Arm overall takes an average of 28 days.
Common stages of the interview process at Arm as a Staff Applications Engineer according to 2 Glassdoor interviews include:
Group panel interview: 50%
Phone interview: 25%
Skills test: 25%
Here are the most commonly searched roles for interview reports -
Two rounds technical review, ask questions about SoC Design, IP integration, FE and ME flow, power control, etc. Then HR review, ask about expected salary, why interested in this job, etc.
Interview questions [1]
Question 1
What is the power up/down sequence of a power domain?
I applied through a recruiter. The process took 3 weeks. I interviewed at Arm (Austin, TX) in Jul 2024
Interview
The interview process starting from HR introduction to the interview panel is conducted very professionally. The team is very receptive to availability of all parties and supports last minute changes which is very appreciated. The process starts with HR team screening and initial QnA to get a clear idea on the pre-requisite. The technical round started a bit later, and was extensively related to logic and approach to solving issues, However, the questions provided had multiple answers and it seems that some of the panel members could not fathom that the solutions they were expecting was in fact creating more issues.
Additionally, questions were specific to domain they are hiring and some of the terminologies are unfamiliar to most candidates and base lining the same is important.
Interview questions [1]
Question 1
1. Cache coherency between multiple CPU
2. Timing path analysis and method for clock speed increase
I applied online. The process took 2 weeks. I interviewed at Arm (Austin, TX) in May 2023
Interview
First round was with 3 interviewers focussing on resume and some AXI protocol basics. Second round was with 3 panel interviewers and the whole process took about 3 weeks .
Interview questions [1]
Question 1
Focused on AXI protocol, Cache coherency , MESI protocol . Be sure to go in depth on these protocols are how they are handled in the industry,